- Model NO.: 80-300
- Certification: CE, ISO
- Customized: Customized
- Transmission Method: Hydraulic Pressure
- Power: 22 Kw
- Control System: PLC
- Roller Material: High Grade No. 45 Forged Steel with 0.05mm Hard CH
- Cutting Blade Material: Cr12 Mould Steel with Quenched Treatment
- Trademark: XDL
- Specification: 80-300
- HS Code: 84552210
- Tile Type: Colored Steel
- Condition: New
- Usage: Roof
- Type: Purlin Forming Machine
- Forming Speed: 25 M/Min
- Roller Station: 12 Stations
- Shaft Material: High Grade No. 45 Carbon Wrought Steel
- Cutting System: Hydraulic Cutting
- Transport Package: Nude Packing
- Origin: China
Light Steel Drywall C U Shape metal  profile cold roll Forming Machine
1.The C purline machine profile drawing: The normal profile drawing is 80-300mm, We can design the machine as your requirements .
Â
2.C purlin machine production line workflow and component:
Decoiler--Roll Forming--PLC System--Hydraulic System--Cutting--Output TableNo | Name | Nnit | Qty |
1 | Decoiler | set | 1 |
2 | Main machine for roll forming | set | 1 |
3 | Control system(PLC) | set | 1 |
4 | Cutting Systerm | set | 1 |
5 | Output table | set | 1 |
3.Main Parameters
Â
Raw material | |
Material spec | colored steel, galvanized steel sheet, aluminum sheet |
Thickness of coil sheet | 1-3 mm |
Machine details | |
Roller material | High grade NO. 45 forged steel with 0.05mm hard chrome plating |
Shaft material | High grade NO. 45 carbon wrought steel |
Cutting blade | Cr12 mould steel with quenched treatment |
Diameter of shaft | 80mm or as your requirement |
Main frame | 400 HÂ steel |
Forming steps | 12 rows |
Productivity | 20-25 m/min |
Hydraulic station power | 22kw |
Controlling system | famous PLC computer control |
Material of  cutting table | Cr 12 mould steel with quenched treatment |
Appearance size | 8500mm*1150mm*1550mm |
Hydraulic oil | 40# hydraulic oil |
Electric tension | 380V 50 Hz 3Â Phase or as your requirements |
After sale-services | |
Delivery | 25-30 workdays after receiving the deposit |
Warranty | Two years warranty and lifelong technical support will be kind and effective provided. |
Payments | 30% deposit by T/T in advance and 70% balance after inspection confirmation before shipment |
4.Machine Pictures:
5.Packageing &Â Shipping
Packaging: Important Components Wiped Anti Rust Oil, Rollers and Shafters covered by foam film, HydraulicÂ
station, PLC control Box, Spare parts and some small parts Packed in plywood box. All Components Fixed by steel wire with Container.Payment Terms: 30%T/T after signed the contract,balanced before delivery
6.Our company service:
Â
1). Two years, and we will provide the technical support for the whole life.
2).Training: the buyer should charge of visa, return ticket, food and accommodation overseas and 100USD/person/day  for salary.
3). Need one technicians
4).Training time: one week (contains the time of installation and adjustment)
7.Our company information:
Cangzhou Xindingli Cold Bending Machinery Co., Ltd is a professional manufacturer and exporter whichÂ
has its own factory and also cooperate with several production factories and concerning withÂ
the design, development and production of cold roll forming machines,material of building. It is located in northwest of CangZhou, as a long history of cold roll forming machine production base. AllÂ
products comply with international quality standards and are greatly appreciated in variety of different markets throughout the world, such as Asia, Africa, Europe,South America, and Australia and so on.
8.FAQ:
1.You are trade company or factory?
-----Â We are factory.We can design the machien as your profile drawing and requirements.
2. Why your price is higher than others?
---- As we persist on that each factory should put quality at the first place. We spend time andÂ
money on developing how to make machines much more automatic, accurate and high quality.Â
We can make sure that our machine could use more than 20 years without any problem. We canÂ
provide 2 years free quality  assurance.Â
3. How long the machine could be made?
---- Normally speaking, welded pipe making machine could be made without 45 working days. IfÂ
you need machines in a hurry, we can make it for you less than a month.
4. How to visit your company?
 ---Â
-a.Fly to Beijing airport:Â Â Â By high speed train From Beijing Nan to Cangzhou Xi (1 hour), thenÂ
we can pick up you.
b.Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Cangzhou Xi(4.5 hours), then we can pick up you.
5. Does one machine can only produce one style panel profile?
---
-Not exactly.For wider and double layer making machine. It can produce more than 6 kinds ofÂ
panels.Â
6. What can you do if the machine broken?
---
-Our machine's warranty period is 24Â months,if the broken parts can't repair,we can send the new
 parts replace the broken parts freell,but you need pay the express cost yourself.if after warrantyÂ
period,we can through negotiationforto solve the problems,and we supply the technical support for the whole life of theÂ
equipment.
If you are interested ,please feel free to contact me:
Contact Person: Ann
 +8615632702205
Â
Nitrogen and oxygen sensors in this category are suitable for Renault, Doosan, Ford, Hino, Weichai and Yuchai. There are two kinds of nitrogen and oxygen sensors, 12V and 24V, which are of high quality and make you feel more at ease. We have the ability to independently develop and produce nitrogen and oxygen sensors. It can also be customized according to your needs. Our nitrogen oxide products can cover 80% of the models. Buy our products and have a one-year warranty, so that you have no worries.
FORD,HINO,DOOSAN,RENAULT,HYUNDAI
RUIAN DELLFEI AUTO PARTS CO.,LTD. , https://www.dellfei.com