Washing Machine Plastic Parts Mould Manufacturer

Model NO.: J1806057
Runner: Hot Runner
Design Software: UG
Installation: Fixed
Certification: ISO
Standard: DME
Customized: Customized
Designsoftware: Ug,Proe,CAD,Catia,Solidworks
Machine Equipment: CNC,EDM,Wire Cutting Machine,Drilling Machine
Heat Treatment: Nitriding
Quality Control: Professional QC in House
Design Time: 7days
Trademark: JSLMOULD
Transport Package: Wooden Case
Specification: Dme
Origin: China
HS Code: 8480719090
Product Name: Washing machine plastic parts mould
Product material: ABS
Core&Cavity Steel: 2738
Steel hardness: HRC48-52
Mould Standard: DME
Cavity Number: ONE
Injection System: DIRECT GATE. SIDE GATE
Ejector System: STRIPPER PLATE, EJECTOR PIN
Cycle Time: 35 to 80S
Tooling lead time: 60DAYS
Mould life: 1, 000, 000SHOTS
Quality assurance: ISO9001


Our Advantage
1. High quality
2. Reasonable price
3. On time delivery
4. Good After-sale service
5. Strict quality control
6. All the mould are automotic.

Offer you
In-time response on letters, telephone calls or fax
In-time supply the quotation and mould designs
In-time communication on the technical points
In-time sending pictures for the mould machining progress and mould finishing schedule
In-time mould test and sample delivery
In-time mould delivery.

For more information please contact us.
Washing Machine Plastic Parts Mould Manufacturer
Washing Machine Plastic Parts Mould Manufacturer
Washing Machine Plastic Parts Mould Manufacturer
Washing Machine Plastic Parts Mould Manufacturer
Washing Machine Plastic Parts Mould Manufacturer

Washing Machine Plastic Parts Mould Manufacturer


1.Offer you mould core & cavity steel certificate
2.Offer you mould trial video
3.Mould process report
Weekly report, mould trial video and samples for your checking
4.Spare parts
wearing spare parts provided
 
FAQ:
 
1.How about your quality control?
We have professional QC team to control mold quality from raw material,machining to the final mould testing parts,as we realize that quality control is the first priority to run business successfully,and the Quality is the life of enterprise.

2.What's your lead time?
For most mold,normally 45 to 60 working days ( not including Chinese official holidays ) after deposit received and mold drawings approved.

3.How to approval samples?
1) You can come to our factory to see the mold testing directly.
2) We could send samples by DHL, TNT, Fedex, and we can send mold running video and molding parts dimension inspection report to you by email.

4.What about your after service?
1 year under normal use procedure,Spare part which is non-man made damaged will be offered for free within one year, and you can contact us at any time if you need help.
 

V-Belts

Fenghua Jade Motor Co., Ltd. , http://www.compositehose-manufacturer.com

Posted on