Due to continuous rains for several consecutive days in recent days, construction has been unable to proceed, and the progress of the auspicious key projects under construction is now reported as follows:
1. Suxin Expressway Beigou Interconnection Line: At present, in addition to the demolition section of the entire line, subgrade engineering and bridge and culvert engineering are under construction, and subgrade engineering is completed by 30%.
2. X308 Lake West Dettige: Cement concrete pavement construction is currently underway, and the single-spot construction is approximately 14 kilometers.
3. Outer ring northwest of the city: At present, the roadbed construction on both sides is being widened, and the subgrade project has been completed 80%.
4. Tanggang Road Extension and Widening Reconstruction Project: At present, the subgrade project has been completed and 12% limestone basement construction is underway. The construction is completed by about 6km.
5. The reconstruction project of X210 Hefei line: At present, the subgrade project has been completed and 12% of the limestone basement is under construction. About 70% of the construction is completed.
6. Danger bridges on rural roads and rural roads: All construction bids have been completed.
1. Suxin Expressway Beigou Interconnection Line: At present, in addition to the demolition section of the entire line, subgrade engineering and bridge and culvert engineering are under construction, and subgrade engineering is completed by 30%.
2. X308 Lake West Dettige: Cement concrete pavement construction is currently underway, and the single-spot construction is approximately 14 kilometers.
3. Outer ring northwest of the city: At present, the roadbed construction on both sides is being widened, and the subgrade project has been completed 80%.
4. Tanggang Road Extension and Widening Reconstruction Project: At present, the subgrade project has been completed and 12% limestone basement construction is underway. The construction is completed by about 6km.
5. The reconstruction project of X210 Hefei line: At present, the subgrade project has been completed and 12% of the limestone basement is under construction. About 70% of the construction is completed.
6. Danger bridges on rural roads and rural roads: All construction bids have been completed.
EVA Twin Colors Building Blocks
EVA Twin Colors Building Blocks is consist of all kinds of twin colors foaming blocks. Made from Eco-friendly, closed cell, non-smell and non-toxic EVA foam material, passes ASTM and EN71 certificates, the safety of this product is the last thing needs to be worried.
The blocks are easy to store and carry cause it is packed with a PVC bag with zipper. Also after a long time of playing, the blocks can be cleaned easily with water thanks to its closed cell foam.
Eva Twin Colors Building Blocks,Twin Colour Building Blocks,Colorful Child'S Building Blocks,Colors Kid Building Blocks,Kids Building Eva Block,Eva Educational Building Blocks
Huizhou City Melors Plastic Products Co., Limited , https://www.melorsfloor.com