Discussion on bidding for military engineering project design

Pick To: The project design bidding is different from other bidding due to its own particularity. The author analyzes the problems existing in the bidding and tendering of the design of our military project, and puts forward some exploratory views on the content of prequalification, bid evaluation, bid compensation and intensive supervision.

Keywords: military engineering; design bidding

 

In recent years, with the pace of national reform and opening up and economic development, our military has continuously explored the practice of bidding for engineering construction projects that meet the characteristics of the military, and has achieved remarkable results. However, the phenomenon of “heavy construction and light design” is still widespread. There are many problems in the design and bidding of military engineering projects in terms of prequalification, bid evaluation methods and bid compensation, which must be paid enough attention.

First, the characteristics of design bidding

The design bidding is not exactly the same as the general construction bidding, equipment and materials procurement bidding, and its characteristics are as follows:

1. The subject matter is not directly comparable. Construction bidding and equipment and materials procurement bidding, the subject matter is physical material, the purpose achieved after successful completion of the contract is the same, so the bidding quotation of the bidder can be used as the main basis for judging . The design of bidding, the subject matter is only a concept, different design units can have different understandings, the results produced by any two design schemes are not the same, so there is no direct comparability, only comprehensive evaluation The method performs an indirect comparison.

2. The bidding content has stage results. Construction bidding, equipment and materials procurement bidding, the main content of the bid is based on the bidder's own experience, strength, technical strength, the bidding unit to present a bid offer, the middle is mainly an economic analysis, except for a small amount of manpower, Apart from the input of material resources, basically no major expenses have occurred, and the project itself has generally not contributed. Although the design bidding scheme is only a scheme, the essence of the design has always been reflected, such as advanced technology, novel appearance, overall concept, etc., which has made significant contributions to the project itself.

Previous [1] [2] [3] Next

Split Warping Machine

Split Warping Machine

A-ZEN split warping machine AZF328 is suitable for polyester, polyamide yarn. The mother yarn is made of a number of monofilaments. The advantage of this machine is that it can save material cost, working space and improve production efficiency.

Technical Data:

Warp Line Speed: 100-750m/min;

Beam Size: Φ21"*21", Φ30"*21";

Warping ends: According to customers` demand;

Positive Let-off Creel:

l Number of mother yarn strands: 72 strands (customized);

l Single-strand mother yarn torque motor controlled, with slight adjustment.

Leveling Roller: 2 sets of servo or inverter controlled;

Drop Stop Device;

Main Motor: 7.5KW AC frequency conversion control;

Control Mode: Computerized real-time control, and user-friendly operation interface.

Split Warping Machine,Mother Yarn Warping Machine,Mono Yarn Warping Machine,Beaming Machine; split yarn warping machine

CHANGZHOU A-ZEN TEXTILE TECHNOLOGY CO.,LTD , https://www.barmachinery.com

Posted on