One party is a strong increase in "My Site and I call the shots," and one side is the "Fast East-West, North-South, and My Bank" rapid layout - in the face of the huge potential Southwest market, FAW-Volkswagen, which is one of the top three brands in the Changan Automobile and the joint venture sedan of the independent brand giants, Although their respective operations are different, their purposes are surprisingly consistent.
FAW-Volkswagen "Core" layout Southwest Southwest on June 19, "going out, please come in" FAW-Volkswagen product quality quest activities held in Chengdu. Professor Sun Wanchen of the Jilin University Automotive Engineering College said in an interview that with the continuous improvement of national emission standards and changes in the world's energy structure, lightweight, small-displacement, and low-emission have become the direction of future engine development.
According to Gong Xingbo, director of public relations at FAW-Volkswagen's brand, the EA211 series engines are the latest engine products for the Volkswagen brand MQB platform, and are the first domestic mass production engines to reach the Euro 5 standard. It is estimated that compared with the previous generation engine, the EA211 achieves a weight reduction of 7%-8%, while the fuel consumption can be reduced by 7%-10%. Currently, the EA211 has been used for the new Jetta and the new golf.
The FAW-Volkswagen Chengdu engine plant broke ground in July 2011. It was completed in October 2012 and was officially put into operation in March 2013. At present, the capacity of the EA211 engine has reached nearly 2,000 units/day, and the annual production capacity can reach 600,000 units. The Chengdu engine plant not only provided the entire industrial chain layout of the “core†to the southwest base, but also provided strong support for the vehicle production of FAW-VW Southwest and South China. On April 15 this year, the FAW-Volkswagen southwest base ushered in the 1 millionth vehicle off the assembly line, creating a production record for the first million vehicles in five years.
Tired Changan Automobile production break 10 million <br> <br> Recently, Zhang Baolin, president of Chongqing Changan Automobile's first and only test track in southwest China - Changan Dianjiang test track for the first 10 million own-brand car unveiled and announced All proceeds from the auction of the car were donated to charity and public welfare undertakings.
It is understood that from the time it entered the automobile field in 1984 to the 1 millionth independent brand automobile in 2001, Changan spent 17 years; and from the 1 millionth to the 6 millionth automobile delivery users, Changan spent only 8 years; This time, Chang'an has completed growth of 6 million to 10 million vehicles in just five years.
Zhu Huarong, secretary of the Changan Automobile Party Committee, said that the first 10 million vehicles manufactured by the company, Rui Zhi, will be auctioned online and the funds after the auction will be used for charity. Zhang Baolin said that currently Changan has added 7,000 new users every day. To ensure growth, this year, the new AA-class sedan New Benben and medium and large-sized SUVCS75 models have been launched. In the second half of this year, Yuexiang V7 and Yahoo! Two models grab the market.
On the same day, Changan Automobile opened the second technical carnival in its first phase of the investment of a 1.3 billion yuan padding in the Dianjiang field. The company not only displayed a number of advanced automotive technologies, but also announced that its Dianjiang testing ground will be open to car manufacturers in the industry. In the test site, nearly 70 kinds of road surfaces were prepared for various tests conducted by new models of domestic car manufacturers.
The device has high accuracy, high efficiency, high rigidity, and high reliability. It can be used to drilling(blind hole, chamfer) connecting plates, foundation plates, end panels, templates, flanges, structural components and other parts in steel structures, bridge building, power communication tower, heat boiler, and etc.
This machine is mainly composed of movable gantry, base, worktable, support frame, movable support, left/right bracket, servo slide power head, automatic chip conveyor, circulation cooling device and electrical system etc.
This machine is mainly used for drilling connecting plates of buildings, bridges, steel towers and other steel structures. The machine with double exchangeable worktables can clamp 4 work-pieces at the same time, with fast hydraulic grippers all around. Chip removal automatically, cooling liquid recycling used. Drilling head has stroke self-controlled function, it can automatically convert from fast feeding to normal feeding without setting the thickness of work-piece and the length of the drilling head. Electrical control adopts upper computer plus PLC control, direct conversion of CAD/CAM.
Boiler Drilling Machine,CNC Boiler Drilling Machine,Boiler Barrel Drilling Machine,High Speed Boiler Drilling Machine
Shandong Sunrise CNC Machine Co., Ltd , http://www.scmcnc.com