On July 29, 2010, the Caterpillar Global Supplier Summit 2010 was held in Beijing. Chairman Ding Yuhua attended the summit. The meeting commended the 2010 Caterpillar outstanding suppliers. Delta Group won the Caterpillar SQEP Platinum Platinum Award, which is also the first Platinum supplier of Caterpillar global suppliers. Caterpillar Group presidents RESOURCE INDUSTRIES and CONSTRUCTION INDUSTRY presented platinum medals to Chairman Ding Yuhua.
The Caterpillar Outstanding Supplier Quality Certification Medal is based on Caterpillar's comprehensive performance in ten aspects including quality system construction, product quality, manufacturing capacity, process technology, and 6 Sigma promotion. Copper, silver, gold and platinum are four grades. One of the very important evaluation indicators is the level of physical quality. It is reported that only by obtaining SQEP medals, it is possible to obtain the right to the simultaneous development of Caterpillar's new products.
Caterpillar is currently the world's largest supplier of construction machinery, earth-moving machinery, engines and generator sets, and ranks among the world's top 500 companies. In 2004, Triangle Group and Caterpillar Corporation established a cooperative relationship to provide the company with engineering radial tires and giant tires and other ancillary products. In 2005, the two sides formally established a strategic partnership. Currently, Delta Group supplies tire products for Caterpillar factories in the United Kingdom, Belgium, Japan, India and other places.
In 2007 and 2008, the Delta Group received Caterpillar's Excellent Supplier Quality Certification (SQEP) Bronze Award and Silver Award. The Delta Group won the Caterpillar SQEP Platinum Award, which shows that its quality, production process and management have reached a new height. It is very important for future development and cooperation with Caterpillar. significance.
Construction Hoist Steel Structure means the Construction Hoist spare parts like Construction Hoist Mast Section, Passenger Hoist Cage, Construction Hoist Wall Tie and so on.
The length of each mast section is 1508mm, the rack is fixed on the mast by three bolts and it can be exchanged. For the single cage hoist there is only one rack on the mast section, and the mast section can be used for the double cages hoist by increasing one rack. The section of the mast is diverse, select one type section according to different hoist. The mast sections are bolted together with M24 bolts and nuts to form mast. The mast is tied to the building with tie-in and is the guide rail of the cage. According to the user`s or circumstance`s request, surface of mast is hot dip galvanized, which can prevent it rusting.
The tie-in(wall tie) is the linked part between mast and building, to keep the stabilization of the mast. Distance between the tie-in is about 6~9m alone the mast. There are several types of tie-in. Select one of them according to need, tie-in can adjust the vertical of mast in definite ranges. According to the user`s or circumstance`s request, surface of the tie-in is hot dip galvanized, which can prevent it rusting.
The cage dimension(L×W×H)(m): 3×1.5×2.5. We can also manufacture cages of other size according to the user`s needs. The material of the cage and the door material can be steel wire weave, aluminum-plastic panel, punched-plate, figured aluminum board or other type according to user`s needs. The gate is equipped with drawing gate,include small turn over gate.
Construction Hoist Steel Structure
Construction Hoist Mast Section,Construction Elevator Mast Section,Passenger Hoist Cage,Construction Hoist Wall Tie, Construction Hoist Anchorage Frame
SHEN YANG BAOQUAN BUSINESS CO., LTD , https://www.sczenghui.com