Xinyang High Speed ​​Railway Station Station Project in Henan

Project Name: Henan Xinyang High-speed Railway Station House Project Progress: Preliminary Design and Construction Period: January 2012 - February 2014 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation facilities, lighting facilities, cranes .
Project Introduction:
The project is located in Xinwudao, north of Xinyang, Henan Province. It is adjacent to New 36th Street in the west and to New Seventh Avenue in the south. It has a station building with a total construction area of ​​80,000 square meters.

Total investment of the project: 100 million yuan.

Construction Unit: Planning and Construction Leading Group in the Front Area of ​​Xinyang High Speed ​​Rail Station Postal address: Xinhua West Road, Xinyang, Henan 464000
Contact person: Li Depeng Telephone, 13637696196

Related Developments: Tower Crane Infrastructure Project

Controller ECU

The pump controller controls the pump so that it can absorb the output point of the engine.

For all the torque, these torques depend on the mode of pump absorption.

Torque specification, fuel control knob setting and actual engine speed.

Why choose us

*Quality Controll

*Competitive price

*OEM Service

*Experience more than12 years' experience

We supply a wide range of spare parts for excavators



Controller ECU

Controller Ecu,Control Ecu,Engine Control Module,Electronic Control Unit

Jining Tongderui Construction Machinery Co., Ltd. , https://www.tdr-excavatorparts.com

Posted on