What are the requirements for the open-air deployment and commissioning of fire pumps? Interested friends and Atlantic Pumps look at the following articles.
Fire pumps are generally arranged centrally below or on the side of the gallery, or they can be arranged near the suctioned equipment. The main advantages are good ventilation and easy operation and maintenance.
Semi-open-air pumps are suitable for use in rainy areas. Pumps are generally located below the pipe gallery and ceilings are placed in the upper part of the pipe. Or place the pump on the lower floor of the frame with the frame platform as the ceiling. According to the pump's layout requirements, the pumps are arranged in single row, double row or multiple rows.
The indoor fire pump is suitable for cold or windy areas and where the process has special requirements. Indoor arrangements should pay attention to fire, explosion-proof, heating, ventilation, lighting and other measures.
Debugging should meet the requirements:
1. When the fire pump is started automatically or manually, it should be put into normal operation within 60s;
2. When starting the fire-fighting pump with standby power supply switching or standby pump switching mode, it should be put into normal operation within 60s.
3. When the regulated pump is commissioned, the analog design start-up conditions, the regulated pump should be started immediately; when the system design pressure is reached, the fire pump should automatically stop running.
Fire pumps are generally arranged centrally below or on the side of the gallery, or they can be arranged near the suctioned equipment. The main advantages are good ventilation and easy operation and maintenance.
Semi-open-air pumps are suitable for use in rainy areas. Pumps are generally located below the pipe gallery and ceilings are placed in the upper part of the pipe. Or place the pump on the lower floor of the frame with the frame platform as the ceiling. According to the pump's layout requirements, the pumps are arranged in single row, double row or multiple rows.
The indoor fire pump is suitable for cold or windy areas and where the process has special requirements. Indoor arrangements should pay attention to fire, explosion-proof, heating, ventilation, lighting and other measures.
Debugging should meet the requirements:
1. When the fire pump is started automatically or manually, it should be put into normal operation within 60s;
2. When starting the fire-fighting pump with standby power supply switching or standby pump switching mode, it should be put into normal operation within 60s.
3. When the regulated pump is commissioned, the analog design start-up conditions, the regulated pump should be started immediately; when the system design pressure is reached, the fire pump should automatically stop running.