- Model NO.: C51 C52
- Standard: GB, EN, API650, JIS Code, TEMA, ASME
- Production Type: Mass Production
- Material: Steel, Brass, Alloy, Copper, Aluminum
- Samples Offer: Yes
- Trademark: Custom logo
- Specification: Custom made
- Application: Auto and Motorcycle Accessory, Hardware Tool, Machinery Accessory
- Surface Treatment: Anodizing
- Machining Method: CNC Machining
- Min Tolerance: 0.0005mm
- Lead Time: 10~20 Days
- Transport Package: Carton and Pallet
- Origin: China
Description of  CNC machining :
The minimum tolerance we can do is 0.0005mm.
Materials:Â Â Aluminum 6061/6063,Titanium, Stainless steel, POM, Brass etc.
Finish:Â Â Anodizing, Chrome plating, Ni/Cr/Zinc plating, Chemical film etc.
Tolerance:Â Â 0.0005mm
MOQ:Â Â 1pcs
Lead Time:Â 3-30 days
QC System:Â 100% inspection before shipment.
Packagings: 1) PP bag, Standard packages, 2) Pallet or container, 3) As per customized specifications.
Shipment Terms: 1) 0-100kg: air freight priority, 2) >100kg: sea freight priority, 3) As per customized specifications.
We have precision 4/5 axis CNC machines in housing and we are well placed to meet your requirements for fast delivery and measuring equipments such as CMM to ensure the quality of each part.
How to place your order :
1.Please send us your drawings( 2D&3D) or sample.
2.Our engineering team work on them and submit competitive quotation for you.
3.Confirm sample order and fabricate samples after you approve the quotation and submit them to you for your inspection.
4.Confirm production order after you approve samples.
5.Payment and shipping terms are negotiable.
FAQ:
Q1: How to have my components quoted ?
A1: Please contact us via TradeManager or Email and send us your drawings inclusive of 2D and 3D( .STEP or .IGES files) and detail requirements. We are pleased to sign NDA with you if you prefer. Then our engineering team will work on them and submit competitive quotation to you.
Q2: What is the lead time for tooling and samples fabrication?
A2: The exact lead time depends on your parts specification.
   The normal lead time is 40-45 days for tooling fabrication and samples.
  If the tooling is not required, the lead time for samples is 15 days normally.
Q3: Can I have prototypes for testing before tooling ?
A3: Yes, our factory have team to support prototypes with machining process to fabricate them for your testing.
Q4: How to ship the samples and production order ?
A4: We will normally ship samples via DHL, UPS or FedEX via our cooperated forwarder or freight collect.
   For the shipping of production order, it will be by sea or by air.
Q5: How to ensure the quality of parts?
A5: Firstly, our team will inspect all incoming material. QC team will inspect parts while production and finished products, then submit Quality Inspection Report together with samples and production order.
Â
Polyurethane Tufflex Screen,Urethane Screen Panels,Polyurethane Dewatering Screen,Polyurethane Screen Media
Anping Red Star Wire Mesh MFG Co., Ltd. , https://www.screening-media.net