China's largest dimethyl ether project officially launched

On September 24, Zhongtian Hechuang Energy Co., Ltd. held an unveiling ceremony in Hohhot, Inner Mongolia. This marks China's largest coal-made dimethyl ether project - Ordos 3 million tons / year dimethyl ether project officially started.

According to reports, Zhongtian Hechuang Energy Co., Ltd. is under the promotion and promotion of the National Development and Reform Commission, and consists of China National Coal Energy Corporation, China Petroleum & Chemical Corporation, Shenneng (Group) Co., Ltd., and China Yintai Investment Co., Ltd. Inner Mongolia Manshi Coal Group Co., Ltd. was jointly established. The company will construct a large-scale coal, chemical, power generation and transportation integration project in Wushenqi, Ordos City. The construction scale will be: coal mining 25 million tons/year, continuous coal gasification with an entrained bed to produce methanol 4.2 million tons/year, and Ether 3 million tons/year, with 2×35,000 kilowatts of thermal power station and long-distance pipeline from Jingdeang to Erdos. The total investment of the project is about 43 billion yuan. It is expected that the project will be completed and put into production in 2010. By that time, the industrial output value will be more than 20 billion yuan, and the tax revenue will exceed 2 billion yuan.

The project is the largest coal chemical project in China to date. This is China's gradual reduction in oil and gas resources, increasingly fierce energy competition, more prominent energy security, and diversified energy structure development. Coal is used as raw material to produce alcohol and ether fuel, and efficient clean energy is developed. Oil substitution strategy is implemented to ease the contradiction between oil supply and demand. A major measure to promote the harmonious development of the economy and society. The construction of the project will demonstrate and promote the development of the coal-based alcohol ether industry in China.

Pressure Parts

Steel Frame, Platform and Stairs for Boiler:
The frame work is mental construction which can operate safely under 7 degree seismic intensity. Adopt diagonal bracing to strengthen in over 7 degree seismic intensity area. The steel frame is delivered in bulk and installed at site.
Arrange platform at furnace top, header, manhole, examine hole and soot blower to observe, operate and overhaul easily. Every platform is connected by stairs.The platform and stairs are twin channel arrangement. The boiler left and right can be passed.

Spare Parts,Slant Fin Boiler,Central Boiler Parts,Boiler Pressure Parts

Jinan Boiler Group Co., Ltd. , https://www.jinanboilergroup.com

Posted on