First, in accordance with the "Regulations on the Administration of Mineral Resources Exploitation Registration", the registration procedures have not been processed beyond the prescribed time limit; the second is that the mining rights are not set up properly, and it is not appropriate to apply for the renewal of registration; the third is the arrears, less payment, and compensation for the loss of mineral resources. fee, mine geological environment governance restoration margin and mining rights fees; Fourth, do not follow the development and utilization mining, cross-border mining, illegal mining rights transfer; Fifth, do not meet the mineral resource planning and national industrial policy; Sixth mining The recovery rate, the mining depletion rate, and the ore dressing recovery rate do not meet the specified requirements; the seventh is that the reserves are not verified to meet the minimum mining scale; the eighth is the safety hazard, which is still unqualified after the rectification within a time limit; Seriously damage the ecological environment, the masses have greater opinions; 10 is not fulfilling the task of land reclamation on time, or the quality of reclamation does not meet the requirements.
High Precision SK OZ Collet Chuck , Straight Shank Collet clamping tool for various sizes of cylindrical shank, high speed and high precision machining.Mechanical spindle and cutting tools and other accessories.High Precision Sk Shank Tool Holder ,balanced G6.3 or G2.5 For choose.We are specializing in the production of Sk Oz Collet Chuck, we can to figure to sample processing, and perfect after-sales service and technical support. Looking forward to your cooperation!
SK Oz Collet Chuck
R8 Milling Chuck,Cnc Sk Oz Collet Chuck,Lathe Sk Oz Collet Chuck,Sk Oz Collet Chuck
JINING QINFENG MACHINERY HARDWARE CO.,LTD , https://www.qftoolholder.com